The production information on this page is updated on Thursdays. Although we do our best to make our delivery dates as accurate as possible, please note that they are estimates and can change. We will also try and convey our production information in an informative manner for those who are unfamiliar with the production work flow or processes. Hopefully while our tools are being produced, you will get an overview of the work and steps involved in bringing our products to your door. Thank you for your continued patronage and please let us know if we can improve the information on this page. |
Welcome to our Manufacturing Schedule web page!
Each tool has its own page. Just click on the tool in the box on the right or down below to view the updates. Feel free to leave comments or questions on each page as well.
We also update our Twitter feed with all sorts of Bridge City tidbits and manufacturing updates, @BridgeCityTools
Friend us on Facebook for other noteworthy items.
Thanks for looking!
In Production
We’ve had some unforeseen personnel changes at the beginning of the year that pushed back the entire production schedule for all our tools. We apologize for the delay!
HP-14 Scraper Plane
HP-6v2 Rabbet, Corner Bead, and Corner Cove Profiles
JMPv2 and Table Saw Precision Fence Systems
KM-2 Kerfmaker
SE Dual Angle Smoother Plane
UG-1 Universal Gauge
Completed Tools
BP-18v2 Bevel Protractor
HP-10 V-Groove Profiles
CT-19 Transfer Bevel
AMPv2 Angle Master Pro & BL-2 Bubble Level – 2012 2017
AS-24v3 Adjustable Square
CS-2 Centerscribe & CS-2a Mortise and Tenon Accessory – 2012 2014 2017
CS-6v2, CS12v2, and CS-18v2 Combination Squares
CT-17 Dual Angle Block Plane
CT-18 Smoothing Plane
Drilling Jigs and Accessories – 2012 2013 2015
DSS-6 – Double Saddle Square
FC-1v2 Flushing Chisel
Folding Japanese Hand Saws
HG-1 Honing Guide and SUG-1 Set-Up Gauge – 2013 2015
HP-10 Convertible Rabbet Plane
HP-10 Crown Kit “Works”
HP-11 FW Tapered Body Shoulder Plane
HP-6FX Mini Multi-Plane Body, HP-6v2 Profiles & Accessories
HP-6v2 3/8″ and 1/2″ Dado Profiles. V-Groove too! (HP-6v2 Bodies as well)
HP-6v2 Dovetail Soles and Accessories (HP-6v2 Bodies too)
HP-6v2 Ogee Profiles
HP-8 Aluminum with Depth Skids
HP-9 Dual Angle Block Plane
Jointmaker Pro – 2011 2012 2013 2015
KM-1 Kerfmaker & TM-1 Tenonmaker
Miter Squares
SE Crowning Plane
SE Block Plane
SF-1
Special Edition Rabbet Plane
SR-6 Pocket Rule, SE-24 Straight Edge, and AS-24v3 Adjustable Square
TS-1v2 Try Square
TS-2v2 Try Square – SS and AL
Please return to the other way.
It is much more laborious to have to go to each site to find out what is happening generaly.
I like the left column with the tool schedule list.
That would allow a place for those that wish to check on a specific tool.
Thank you for considering this,
Allan
I actually like it this way. If you are only interested in a particular tool schedule it is all on one page. Even though I have most all of the tools on order it just reads better IMHO.
I agree with Ron. I like it better this way.
Sorry if this is a newby question, but I was looking for an actual ETA on delivery of the JMPv2 and Fence. Do we have one?
I updated the JMP schedule page with our delivery estimates.
I don’t see the status of the DSS-6 square on the schedule. Is it listed elsewhere?
The Pre-Order window closes on Monday after the WIA show in Pasadena. I will then put the DSS-6 up on the Schedule Page.
Michael
When do you plan to make more HP-6v2 bodies? I have a pile of profiles that I cannot use yet, so thanks for the info (and thanks for the sale on profiles!)
HP6v2 bodies are in the queue! I suspect sometime in late Feb.
-John
Any schedule on the completion of the SP-26 Sliding Parallel?
I was mentally lumping the SP-26 in with the HP-6v2 Dovetail Soles. I’ll get that out on its own page. The extrusion die is under way for that.
Michael, why is the HP-10 not on the schedule???
How’s the HP-10 dado works doing. I’m feeling groovy…..
Coming along. The soles went out for anodizing this week.
The soles are currently in the anodizers and irons are about a week away from completing machining. Hopefully this will be out in about 6 weeks and I’ll have a better update then.
– Consuelo
Any updates on the MT-1 AL? Looking forward to getting it.
Parts are under the spindle. We are still waiting on first sample approval on the blades. That’s all I know at the moment!